Does the county or my city issue the permit?
Miami-Dade says its application process is for unincorporated properties with folios beginning with 30. Each municipality has its own Building Official. A Miami mailing address alone does not establish the permitting jurisdiction; check the property record and the relevant building department.
Do kitchen and bathroom remodels need permits?
Changes to electrical, plumbing, mechanical, or structural systems generally need the appropriate permits. Moving a sink, changing wiring, or removing a wall should not be treated as cosmetic work. Ask the building department to confirm the permits for your full scope, even if the room's layout mostly stays the same.
What about painting, flooring, and minor repairs?
The county lists interior painting, wallpapering, and resurfacing floors among work that can be exempt. Its current exemptions page also describes a limited residential exemption process with eligibility and documentation requirements. An exemption is not a blanket approval: other zoning or agency requirements may still apply. Check the current official list before relying on an exemption.
Do impact windows, exterior doors, or wall removal need permits?
The county identifies window and exterior-door replacement, roof work, and interior wall alterations as permit work. Its exemptions guidance also excludes structural work, including windows and doors, from the limited residential exemption. Confirm required plans and product documentation before ordering or installing replacements.
What should I prepare, and can I apply myself?
Start with a defined scope and the current application forms. The required plans and supporting documents depend on the work and reviewing disciplines. The county explains licensed-contractor and owner-builder options; owner-builder exemptions carry responsibilities and are not appropriate for every project. Review those conditions before deciding who will apply.
How long does approval take, and what does it cost?
There is no single reliable estimate for every remodel. Your scope, required reviews, application completeness, and requested corrections affect the process. Use the county's current application instructions and ask for the applicable fees and review requirements for your project; do not build a construction start date around an assumed approval.
When are inspections needed, and how do I close the permit?
Required inspections depend on the permit and trade. The county requires inspection before work is covered or concealed, and approved stamped plans and the permit card must be available at the site. Coordinate inspections before closing walls. Check the inspection results and confirm required final approvals and permit closure with the building department—not just that construction looks finished.
Official sources
- [1]Miami-Dade: How to Apply for a Permit
- [2]Miami-Dade: Permit Exemptions
- [3]Miami-Dade: Homeowners General Permit Information
- [4]Miami-Dade: Inspections
General planning information, not a permit approval or legal advice. Requirements can change and depend on the property and scope. Always confirm current rules with the responsible department.